Oak Grove Elementary, 10401 Penny Road, Raleigh: grades Pre-K-5, 539 students in 2024-25, a C (69) state grade.
Last checked Oct. 12, 2026. Sources: the school’s website; the Wake County Public School System’s enrollment and calendar pages, base school lookup and draft 2027-28 enrollment plan; the N.C. Department of Public Instruction’s 2024-25 report card data and 2025-26 school assessment workbook; and the federal NCES school directory.
Oak Grove Elementary is a Wake County Public School System elementary school at 10401 Penny Road, Raleigh. The school has a Raleigh mailing address, but the U.S. Census Bureau’s geocoder places the campus inside Cary town limits. In our Oct. 12 check of 986 home addresses spread across Cary in the district’s base school lookup, 29 were assigned to Oak Grove Elementary. The school’s about page describes its year-round calendar as allowing continuous learning.
Who to call
- Front office: 919-387-4490, 10401 Penny Road
- School website: oakgrovees.wcpss.net
- Enrolling a new student: WCPSS enrollment page; Student Assignment 919-431-7333
- Which school is my address zoned for? the district’s base school lookup
- Buses: WCPSS Transportation 919-805-3030
| Address | 10401 Penny Road, Raleigh, NC 27606 |
| Phone | 919-387-4490 |
| Grades | Pre-K to 5 |
| District | Wake County Public School System |
| Calendar | Year-round, multi-track |
| State school code | 920522 |
Principal
Principal Beverly Benton, according to the school’s website.
Enrollment and teachers
- State count: an average daily membership of 539 students in the 2024-25 school year, up from 534 in 2023-24, according to the state’s report card data.
- Federal count: 537 students in the 2023-24 school year, with 45 full-time-equivalent teachers, according to the NCES directory. That is about 12 students per teacher.
State report card
North Carolina grades every public school A to F. The grade is based 80% on student achievement and 20% on academic growth, according to the state’s 2025-26 annual testing report. For this school, achievement is measured mainly by the state’s end-of-grade reading, math and science tests.
| School year | Grade and score | Growth |
|---|---|---|
| 2024-25 | C (69) | Met |
| 2023-24 | C (69) | Met |
The 2024-25 grade is the latest in the state’s downloadable report card data. From the state’s 2025-26 school assessment workbook:
- At grade level or above, all state tests: 67.7% (statewide, all tests: 59.2%)
- College and career ready (Level 4 and above): 47.6%
- Growth: exceeded expected growth
- Reading, grades 3 to 8: 64.3% at grade level or above; math: 69.6%
The full report card, with class sizes, teacher data and school safety figures, is on the state’s NC School Report Cards site.
Attendance zone
WCPSS assigns every address a base elementary, middle and high school. Enter an address in the district’s base school lookup to see all three, or browse the base attendance area map. Zones do not follow town limits or mailing addresses. We did not find a published feeder list on the district’s enrollment pages, so we do not name feeder schools here; Student Assignment, 919-431-7333, can confirm an address.
The list of proposed base area changes in the district’s draft 2027-28 enrollment plan, which the Board of Education is scheduled to vote on Nov. 17, does not name Oak Grove Elementary. Check an address with the proposal lookup.
Calendar and bell times
Oak Grove Elementary follows the district’s multi-track year-round calendar, so break dates depend on a student’s track. Coming days off on the 2026-27 year-round calendar (PDF):
- Track 1: Nov. 3, Nov. 11 and Nov. 25-27; then out Dec. 7 to Jan. 1 (track-out and winter break)
- Track 2: Nov. 3 and Nov. 11; tracked out Nov. 16 to Dec. 4; winter break Dec. 21 to Jan. 1
- Track 3: tracked out Oct. 26 to Nov. 13; Thanksgiving Nov. 25-27; winter break Dec. 21 to Jan. 1
- Track 4: tracked out through Oct. 23; Nov. 3, Nov. 11 and Nov. 25-27; winter break Dec. 21 to Jan. 1; tracked out Jan. 4-22
Bell times: 9:15 a.m. to 3:45 p.m., according to the bell schedule posted on the school’s website.
More
- The school’s own website and the district’s enrollment page
- Every public school in Cary, with zones and report cards
- Our Cary schools guide for district calendars, enrollment dates and the school board
Frequently asked questions
What grades does Oak Grove Elementary serve?
Oak Grove Elementary serves pre-kindergarten through fifth grade.
What is Oak Grove Elementary’s school grade?
Oak Grove Elementary earned a C, with a score of 69, in North Carolina’s 2024-25 School Performance Grades. In 2025-26, 67.7% of its state tests were at grade level or above and it exceeded its growth target.
What time does Oak Grove Elementary start?
The school day runs 9:15 a.m. to 3:45 p.m., according to the school’s website.
How do I know if my address is zoned for Oak Grove Elementary?
Enter the address in the Wake County Public School System’s base school lookup, or call Student Assignment at 919-431-7333. Zones do not follow town limits.
Have your say